The drive is usually the last thing discussed and the first thing that decides how the platform behaves years later. The diameter is settled, the finish is chosen, and then the contractor asks which drive to fit. The answer sounds like a catalogue choice between two names: pin gear or friction.
Both names describe how rotation reaches the deck, not how well the platform parks a car. A toothed ring and a pressed contact wheel can sit under almost identical steel plates, and both will turn a car on a dry, level day. What separates them is rain, dust, a fall in the slab, an off-centre load, a power cut and the person who has to replace the worn part. Start with the site and the vehicle, and the drive follows from that - not the other way round.
What is actually in a drive · Which drive fits your site · Jump to the enquiry form
A drive is a chain of named parts. Ask any supplier to write them down and the comparison becomes technical instead of promotional:
None of those lines is an adjective. Every one is a part, a drawing or a named protection item that your contractor can check and later replace. Here is how to judge the two drives once the parts are on the table.
Run those five checks and the drive choice stops being a preference and becomes a consequence of how the platform will actually be used.
A pin-gear drive is the safer default where the platform is outdoors, exposed to rain or dust, set on a fall, or regularly carrying an off-centre load. A friction drive can be adequate on a level, dry, sheltered site with predictable loads, provided the contact track is kept clean and the wear item is reachable for service. Neither is universally better; one of them is the better answer for your ground and your vehicle.
That is the rule in one paragraph, and it still leaves the part nobody can settle from a photograph: the heaviest vehicle that will use the platform, the fall of the surface, the local supply, and whether you need the car movable without mains power. We do not guess those lines. The drive layout, the power-cut note and the service positions are issued with the equipment so your contractor can see what is included.
If the arrival route itself is steep or drains badly, that is related but separate. Our driveway site checks and cost breakdown cover the approach and the equipment budget; a correctly specified drive does not remove the need to check the ground that leads to the platform.
| Site condition | What is checked first | Drive that usually follows |
|---|---|---|
| Level, dry and sheltered, predictable vehicle | Contact-track condition, load position and access to the wear item | Friction drive can be considered with a written service note |
| Outdoor, wet or dusty, or a fall in the surface | Engagement method, start-under-load behaviour and protection of the whole assembly | Pin-gear engagement normally specified |
| Heaviest vehicle or power-cut behaviour not confirmed | Load distribution, supply arrangement and manual release requirement | Undecided until the vehicle and site are confirmed - no drive should be assumed |
Indicative only. Vehicle load, gradient, exposure and the local supply all change the specification.
If you cannot tell which row describes your site, that is the gap worth closing. Send the vehicle and site details → and our engineers will recommend the drive that fits.
The rest of this page is the detailed drive reference - kept visible for contractors, architects and anyone checking an engagement, control or spare-part line by line.
| Item | Pin gear | Friction drive |
|---|---|---|
| Engagement | Toothed gear engages a mating ring; torque is carried by tooth contact | Driven wheel presses against a contact track; torque is carried by friction |
| Wet or dusty conditions | Tooth engagement is less dependent on a clean, dry contact surface | Contact condition matters; the track and wheel must be kept clean |
| Slope and off-centre load | Specified where the platform starts against a fall or with the vehicle off centre | Reviewed against the actual load position and available contact pressure |
| Normal service item | Drive gear, ring teeth and supporting rollers inspected during service | Drive wheel or lining is the expected wear item, with the track inspected |
| Service access | Drive position marked on the layout drawing before infill or paving is laid | Contact wheel position marked so the wear item can be reached |
| Power-cut behaviour | Control recovery and manual release stated per configuration, not assumed | Control recovery and manual release stated per configuration, not assumed |
| Typical use | Outdoor and exposed platforms, heavier or unevenly loaded vehicles | Level, dry, sheltered platforms with predictable loads |
| Question | Why it changes the drive | What we return with the equipment |
|---|---|---|
| Voltage, frequency and phase | The motor and variable-frequency drive are selected for the local supply | Supply requirement and control-box position on the layout drawing |
| Outdoor exposure | Motor protection, control-box protection and whole-assembly protection are separate lines | Protection items named individually, with drainage and standing water excluded |
| Controls and emergency stop | Wall control, remote handsets and stop position affect both the equipment and the site work | Control package list and cable route |
| Power cut and manual release | Recovery behaviour and any release arrangement depend on the configuration | Written power-cut note stating what is included |
| Local contractor installation | Equipment and site work have different scopes and different responsible parties | Drive layout drawing with the interface points marked |
| Spare parts and service | Wear items differ between the two systems, and access must be planned before infill is laid | Service items list with an ordering route for rollers, drive parts, controller and remote |
Ask three separate questions: what the control does when supply returns, whether the platform can be moved without mains power, and which of those options is actually specified for your configuration. Motor protection, control-box protection and protection of the whole assembly should be listed separately. A waterproof motor alone does not make the installation suitable for standing water.
Equipment and site work are separate. We supply the platform with a drive layout drawing, a power-cut note and the interface positions marked; the local contractor handles the ground interface and a local electrician handles the supply connection. Ask both scopes to be described in writing so nobody is assuming work that is not theirs.
No. Motor protection, control-box protection and the protection of the whole assembly are different specifications and should be listed by name. An outdoor platform also needs a fall that takes water away from the drive and the service points. If the site can hold standing water, that has to be solved in the ground works, not assumed from a motor rating.
Tooth engagement is normally specified where the platform is exposed to rain or dust, set on a fall, or regularly started with the vehicle off centre, because it does not rely on a clean contact track. A friction drive is reviewed against the actual load position and available contact pressure, and it belongs on level, dry, sheltered sites with predictable loads. Send the site conditions and we will confirm which one applies.
The expected wear items differ: a friction drive has a drive wheel or lining and a contact track to inspect, while a pin-gear drive has the gear, ring teeth and support rollers checked during service. Controllers and remote handsets are also replaceable items. We mark the service positions on the layout drawing before infill or paving is laid and list the spare-part order route with the equipment.
Yes. The motor and variable-frequency drive are selected for the local supply, and the position of the control box and local isolator affects the cable route on site. Give us your country and supply details with the vehicle and site information, and we return the supply requirement together with the drive layout and the power-cut note.
Send your heaviest vehicle, a note on the slope and drainage, your local power supply and whether you need manual release. Our engineers will confirm the drive and return a written equipment quotation with the layout drawing.